Tyreline

The Tyreline building consists of a 9,000m² warehouse.

Client:
Calder Stewart Construction
Location:
18 John Spencer Way, Rukuhia, Hamilton
Duration:
11 months
Completion Date:
Feb 13, 2023

Tyreline

The Tyreline building consists of a 9,000m² warehouse, 460m2 of office space, and a 163m² staff café located on the ground floor. A 180m² first floor is utilised as meeting rooms and a seminar room.  

‍

Elektron Installed:

630A three phase MSB

3 x 160A three phase sub distribution boards

1,000m+ of ducting

350m+ cable tray install with seismic bracing

9,500m+ of comms cable

1 x UPS

520+ light fittings

25,000m+ of cable

10+ pole lights

‍

The site has one main switchboard located in the Promotion Store. This board is manufactured from NHP modular metalwork with NHP distribution componentry. The main switch is a 3-pole moulded-case circuit breaker (MCCB) rated at 600 amps. There are three distribution boards on site providing lighting and general power services to the warehouse and offices.

‍

ON Switchgear  manufactured all the boards for this job.

Quibusdam

Sunt eaque voluptate

Optio cum ratione

Projects

Similar Projects

Ruakura Superhub, Hamilton
Aug 4, 2023
5 min read

Kmart Distribution Centre

Ruakura Superhub, Hamilton
Rotokauri Transport Hub is a local transport station in north Te Rapa, Hamilton.
Dec 16, 2020
5 min read

Rotokauri Transport Hub

Rotokauri Transport Hub is a local transport station in north Te Rapa, Hamilton.

Your project awaits